HomeNews technical literature
 
Installation cabinet

Between the cabinet and the cabinet should be firmly connected, the deviation value should be within the allowed values
The terminal box cabinet should be installed firmly and reliably, good sealing, and should be moisture-proof, dustproof. The location of the installation should be easy to check.
The cabinet should be firmly grounded, all doors should be naked copper wire and the grounding metal framework of a reliable connection.
The cabinet should be installed for the overhaul by the grounding device.
Complete the installation should meet the following requirements
Mechanical locking, electrical locking action should be accurate and reliable;
Net door open flexible;
The surface of the paint should be complete, no damage;
Cabinet color harmony;
Cabinet with standard complete and unified, consistent direction, reasonable, unified with hole.